Why we exist
In June 2024 a regional blackout paralysed the Balkans. For hours, nobody could say with confidence how or where the failure had started. The infrastructure was there; the visibility was not. LoRaSi was founded in 2025 out of research presented at the MIPRO convention in Opatija, with a narrow and stubborn goal: make high-voltage infrastructure report its own condition, in terrain where doing so is genuinely difficult.